Stormwater Plans

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

When to use this process

A stormwater and erosion control permit is required when work being performed causes stormwater flows to change, such as the paving of streets, parking lots, or buildings.

Use this process to submit stormwater and erosion control plans independently from civil plans. If you are submitting civil plans, use our civil plans webpage for information about that process but refer to this webpage for the checklist items.

Most stormwater discharges are considered point sources and require coverage by NPDES (National Pollutant Discharge Elimination System) permit through South Carolina Department of Environmental Services (SCDES). The primary method to control stormwater discharges is through the use of best management practices (BMPs). 

Get ready

Required documents 

Use the below checklists for specific items to include on the stormwater plans and SWPPP report.

  1. Stormwater plans
  2. Stormwater Pollution Prevention Plan (SWPPP) report with stormwater calculations
  3. Stormwater Mitigation Worksheet (PDF)
  4. Stormwater Sediment Control Certification (PDF)
  5. SCDES Notice of Intent application for NPDES permitting if applicable: For all non-residential sites and single-family lots that are part of a "Larger Common Plan," use the Notice of Intent (NOI) Application (PDF). Although you will submit this directly through the State's portal, we will review a copy first. For new development of less than one acre, stormwater requirements will be evaluated on a site-specific basis but an NOI application is still required.

Required licenses

Business licenses are required for all design professionals before plan review comments will be issued.

Stormwater Plans Checklist

General Information
General Site Features
Erosion Control and Sedimentology Features
Stormwater Mitigation Facilities
Storm Drainage System
Post Construction Water Quality
Required Notes

SWPPP Report

Checklist
Apply
  1. Apply Online using the button above.
    •  Click on “New Applications"
    • Click on “Development Plan Review”
    • Click on “Civil Engineering Plans and Related"
    • Click on "Erosion Control/Stormwater Plan" and follow the prompts from there
  2. At this time, we will email you an invoice for the development fees, which will be paid through our online portal. Beware of scammers trying to obtain false payment through wire transfer or other mechanisms.
  3. City staff will review your request and send comments back to the designated contact person on the application within approximately 10 business days.

Next Steps

After all major comments have been addressed on your plans, typical next steps include: 

  1. Applying for a SCDES stormwater (NPDES) permit
  2. Preparing for preconstruction meeting:
    • Submit a preconstruction form
    • Print two full sets of the plans with the City stamp-- you will bring one to the preconstruction meeting and keep the other on site during construction 

After any of those required steps have been completed, we will schedule a site preconstruction meeting and then issue a grading permit for you to begin the site work. 

Additional Resources

Stormwater Complaints

  • Complaints related to new construction: Please report to Planning & Development Department's Infrastructure Division at 803-329-5515.
  • Other complaints (such as drainage problem in your yard): Please report to the Stormwater Division of the Public Works Department at 803-329-5614 or stormwater@cityofrockhill.com